windcorridor.org

windcorridor.us

windconsortium.org

windbank.org

These domain names are for sale.  For more information
contact us at:
info @ kickerpublishing.com

 


 

 

A 2005 Stanford University study found that there is enough wind power worldwide to satisfy global demand 7 times over — even if only 20% of wind power could be captured.

Building wind facilities in the corridor that stretches from the Texas panhandle to North Dakota could produce 20% of the electricity for the United States at a cost of $1 trillion. It would take another $200 billion to build the capacity to transmit that energy to cities and towns.

That's a lot of money, but it's a one-time cost. And compared to the $700 billion we spend on foreign oil every year, it's a bargain.

Source: The Pickens Plan

 

contact: info @ kickerpublishing.com

©2007-2010 Kicker Publishing, All Rights Reserved